Friday, 24. November 2017, 21:34 UTC+5

 

Quality in bp plastic injection process

Quality control in bp plastics is based on three pillows.

 

The first is to check the pre production status. That means to check the physical status of incoming raw material by arriving of the material and even before usage in injection molding process. Else the status of the mold is very important will be checked before every production.

 

The second pillow is an inline check of all parameters which are given by plc of injection molding machine. by graphical analyses we monitor all parameters of the machine and will see any tendency for leaving the tolerances so we can act before it happens and run a nearly 100% good parts strategy.

 

The third is to check the after production status.That means all good will be checked by following the regulations of ISO 3951(Sampling Procedures for Inspection). BP plastics will store samples of every production to monitor the quality constantly.

 

Contact us:

Contact Form
via Email

Tel: +91 7299 0257 89